
Transmission Network Expansion Planning method considers return rate based on Dependent- chance bi-level programming method is presented in the paper. The upper level objective of the model is maximum realization rate of return rate being bigger than one realization level. The lower level programs have two sub-problems, one is social profit maximization in normal operation, the other is load shedding being lower than one realization rate in N-1 operation environment. Monte-Carlo method is adopted to mimic uncertain parameters. A hybrid algorithm combining Genetic algorithm and prime-dual interior point method is adopted to solve the proposed model. 18-bus system has been tested in the paper, the results prove proposed method is valid.
| selected citations These citations are derived from selected sources. This is an alternative to the "Influence" indicator, which also reflects the overall/total impact of an article in the research community at large, based on the underlying citation network (diachronically). | 3 | |
| popularity This indicator reflects the "current" impact/attention (the "hype") of an article in the research community at large, based on the underlying citation network. | Average | |
| influence This indicator reflects the overall/total impact of an article in the research community at large, based on the underlying citation network (diachronically). | Average | |
| impulse This indicator reflects the initial momentum of an article directly after its publication, based on the underlying citation network. | Average |
