
Main roads are public infrastructures that serve to connect various areas. With the increasing daily volume of transportation mode usage, infrastructure development has become a necessity, especially for land transportation facilities. HR. Muhammad Street is classified as a type 6/2 T road, with two lanes separated by a 2-meter-wide median; each lane is 2.5 meters wide for two lanes and 2 meters wide for one lane in each direction. The technique applied in this research is a quantitative method based on the PKJI 2023 guidelines. Information was obtained from both primary and secondary data. Primary data refers to information gathered from surveys, while secondary data refers to supporting information obtained from previous journals. The research findings indicate that the peak hours for vehicle U-turns are at 16:45 – 17:00 for passenger cars, 12:00 – 12:15 for heavy vehicles, and 16:15 – 16:30 for motorcycles. The peak vehicle volume occurs on Wednesday evenings from 16:00 to 18:00 WIB, where degree of saturation reaches 0.93, which falls into Level of Service E.
PKJI 2023, Traffic volume, Level of service
PKJI 2023, Traffic volume, Level of service
| selected citations These citations are derived from selected sources. This is an alternative to the "Influence" indicator, which also reflects the overall/total impact of an article in the research community at large, based on the underlying citation network (diachronically). | 0 | |
| popularity This indicator reflects the "current" impact/attention (the "hype") of an article in the research community at large, based on the underlying citation network. | Average | |
| influence This indicator reflects the overall/total impact of an article in the research community at large, based on the underlying citation network (diachronically). | Average | |
| impulse This indicator reflects the initial momentum of an article directly after its publication, based on the underlying citation network. | Average |
