
In view of problem that scheme of single preventing override trip and scheme of preventing override trip of surface power system cannot solve underground override trip fault effectively, the paper proposed a scheme that using power monitoring system to solve underground override trip fault. Taking power network of Henan Pingbao Coal Industry Company as example, it introduced realizing principle and implementing situation in details. The actual application showed that the scheme can realize cooperation of upper and lower switches and prevent override trip fault effectively.
Mining engineering. Metallurgy, TN1-997, mine power supply, override trip, power monitoring, time difference, association delay
Mining engineering. Metallurgy, TN1-997, mine power supply, override trip, power monitoring, time difference, association delay
| selected citations These citations are derived from selected sources. This is an alternative to the "Influence" indicator, which also reflects the overall/total impact of an article in the research community at large, based on the underlying citation network (diachronically). | 0 | |
| popularity This indicator reflects the "current" impact/attention (the "hype") of an article in the research community at large, based on the underlying citation network. | Average | |
| influence This indicator reflects the overall/total impact of an article in the research community at large, based on the underlying citation network (diachronically). | Average | |
| impulse This indicator reflects the initial momentum of an article directly after its publication, based on the underlying citation network. | Average |
