Powered by OpenAIRE graph
Found an issue? Give us feedback

TROLLEY:MOTION

TROLLEYMOTION - VEREIN ZUR FORDERUNG MODERNER TROLLEYBUSSYSTEME
Country: Austria

TROLLEY:MOTION

2 Projects, page 1 of 1
  • Funder: European Commission Project Code: 101095882
    Overall Budget: 30,492,000 EURFunder Contribution: 22,776,200 EUR

    The eBRT2030 project will create a New Generation of advanced full electric, urban and peri-urban European Bus Rapid Transit (BRT) enhanced with novel automation and connectivity functionalities, to support sustainable urban transport by reducing cost/km/passenger, TCO, GHG and pollutant emissions and traffic congestion. The eBRT2030 project is developed through three main lines: 1) The development of technology-focused key innovative solutions for BRT, both at system and subsystem level, at level of vehicle, infrastructure, operation, and IoT connectivity 2) 7 demos of BRT system innovative solutions in real-operation, both city-&operator-led and BRT system-focused, or focused on specific technology innovation at subsystem level that are ready for BRT operations, in Europe and outside Europe (in Latin America and East-Africa), and fully integrated in the whole urban mobility scenario 3) the definition a new European concept of Bus Rapid Transit for year 2030, benefitting of evaluation, multiplication and replication of the real-operation test of innovations, that improve the performance of the whole European urban bus system. All cities in eBRT2030 have BRT lines already in operation or launched within 2023, and strongly committed to innovate with electrification, automation, connectivity technology tailored to the characteristics of European bus operations.

    more_vert
  • Funder: European Commission Project Code: 636012
    Overall Budget: 5,988,750 EURFunder Contribution: 5,988,750 EUR

    The overall aim of ELIPTIC is to develop new use concepts and business cases to optimise existing electric infrastructure and rolling stock, saving both money and energy. ELIPTIC will advocate electric public transport sector at the political level and help develop political support for the electrification of public transport across Europe. ELIPTIC looks at three thematic pillars: • Safe integration of ebuses into existing electric PT infrastructure through (re)charging ebuses “en route”, upgrading trolleybus networks with battery buses or trolleyhybrids and automatic wiring/de-wiring technology • upgrading and/or regenerating electric public transport systems (flywheel, reversible substations) • Multi-purpose use of electric public transport infrastructure: safe (re)charging of non-public transport vehicles (pedelecs, electric cars/ taxis, utility trucks) With a strong focus on end users, ELIPTIC will analyse 23 use cases within the three thematic pillars. The project will support uptake and exploitation of results by developing guidelines and tools for implementation schemes for upgrading and/or regenerating electric public transport systems. Option generator and decision-making support tools, strategies and policy recommendations will be created to foster Europe-wide take up and rollout of various development schemes. Partners and other cities will benefit from ELIPTIC's stakeholder and user forum approach. ELIPTIC addresses the challenge of “transforming the use of conventionally fuelled vehicles in urban areas” by focusing on increasing the capacity of electric public transport, reducing the need for individual travel in urban areas and by expanding electric intermodal options (e.g. linking e-cars charging to tram infrastructure) for long-distance commuters. The project will strengthen the role of electric public transport, leading to both a significant reduction in fossil fuel consumption and to an improvement in air quality through reduced local emissions.

    more_vert

Do the share buttons not appear? Please make sure, any blocking addon is disabled, and then reload the page.

Content report
No reports available
Funder report
No option selected
arrow_drop_down

Do you wish to download a CSV file? Note that this process may take a while.

There was an error in csv downloading. Please try again later.