
Due to the great importance of geodetic networks for the formation of a unified coordinate system on the territory of Ukraine, external geodetic signs have been established, which need to be restored and further developed. At the design stage, the calculation of the heights of geodetic signs is performed on topographic maps. The cost of erection of geodetic signs on average is 50 - 60% of the total cost of creating a geodetic network, so there is a need to pay close attention to the choice of places to build signs that provide their optimal height. The article presents a methodical approach to determining the heights of external geodetic signs, based on the mathematical apparatus used for modeling and solving optimization problems. The principle of construction of the optimization model of the problem during the design of external geodetic signs in the conditions when their direct visibility should be provided is considered. The article considers in detail the types and structures of external geodetic signs, identifies the features of their location and construction. The resulting optimization model includes objective function, which is a quadratic form, and line restriction. This model is a model of quadratic programming, that belongs to a class of nonlinear programming models, but have their particular case and the simplest of nonlinear. This is because property quadratic model, which consists in the fact that since the problem of quadratic programming set of feasible solutions is convex, then, if the objective function is concave, any local maximum is global, and if the objective function is convex, then any local minimum is also global. The necessity of solving the problem of optimizing the heights of geodetic signs is substantiated, which is still connected with the financial costs for their construction and reconstruction. It is concluded that the approach to determining the heights of external geodetic signs presented in the article, which uses a mathematical apparatus for solving optimization problems, is an effective and efficient approach, and allows to numerically justify the minimum required and sufficient height of external geodetic signs. Using the present approach to the determination of geodetic heights external signs to optimize the financial costs of their construction, which is essential.
| citations This is an alternative to the "Influence" indicator, which also reflects the overall/total impact of an article in the research community at large, based on the underlying citation network (diachronically). | 0 | |
| popularity This indicator reflects the "current" impact/attention (the "hype") of an article in the research community at large, based on the underlying citation network. | Average | |
| influence This indicator reflects the overall/total impact of an article in the research community at large, based on the underlying citation network (diachronically). | Average | |
| impulse This indicator reflects the initial momentum of an article directly after its publication, based on the underlying citation network. | Average |
