Lower drive of continuous action unit to form underlying layer of road

V. A. Nikolaiev;
Open Access
  • Published: 01 Mar 2021 Journal: The Russian Automobile and Highway Industry Journal, volume 18, pages 30-41 (issn: 2071-7296, eissn: 2658-5626, Copyright policy)
  • Publisher: Siberian State Automobile and Highway University (SibADI)
Abstract
Introduction. A continuous action unit for the formation of an underlying layer is designed to increase productivity in the construction of roads and other facilities, for which it is necessary to remove the top layer of soil. In the bucket of the continuous action unit to form an underlying layer of roads provides the use of working bodies, cutting the ground with blades of knives. The cut-off soil enters the buckets. The forces attached to the bucket are considered. Theoretically reasonable total energy costs for ground cutting of one cubic meter by buckets of continuous action unit to form an underlying layer of roads requires 109 kilojoules. Based on the cal...
Persistent Identifiers
Subjects
free text keywords: continuous action unit, soil, projection of forces in horizontal plane, traction force, traction chains, torque, lower drive, drive stars, Transportation engineering, TA1001-1280