IEC 61850 substation experiences

Authors: M. Childers; M. Borrielli;

IEC 61850 substation experiences

Abstract

The advent of IEC61850 Standard has ushered a new age for substation automation. This standard has gained a very strong footing in Europe and its application is spreading across the world. In USA the progress towards IEC61850 implementation is relatively slower. IEC61850 holds great promises for substation automation and protection. There are many advantages that this standard brings to the area of protection and automation in the form of reduced substation cost, ease of communication, reduced wiring cost, and interoperability between various multi-vendor IEDs. Although this standard is viewed as being very useful and cost-effective, there are several new challenges posed by the implementation of this standard in the US. Some of these are the level of understanding of this standard in the US is spotty which will improve over time. Another issue that concerns utilities in the US is the level of cyber security that this standard provides. At this point the IEC61850 in the US is limited to the walls of the substation. Hence, for the present time, the cyber security issues are within the regulation imposed by the various regulating agencies in the US. One other issue that is very critical is the new techniques and tools required for commissioning a substation that has multi-vendor IEDs. This main thrust of this paper is to highlight some of the installation and commissioning issues that were encountered during one of the pilot projects at a utility in the US. This pilot project involved the first IEC61850 substation built in the US with multi vendor IEDs. There were several challenges that the commissioning team had to face and it was a great learning experience for everybody involved. This paper will highlight all the experiences associated with making this first IEC61850 substation a great success in the US. This paper will consist of four sections. The first section will cover the hardware needed to support the IEC61850 communication over a TCP/IP network. The second section will explain what and how IEC61850 GOOSE works. This section will include an example of a line relay application. The second section will also cover the security aspects of using IEC61850 for substation control and protective relay applications. The third section will cover testing the individual measuring units in the relays and the overall protection scheme tests. The fourth section is about lessons learned during the initial design and substation commissioning. (5 pages)

  • BIP!
    Impact byBIP!
    selected citations
    These citations are derived from selected sources.
    This is an alternative to the "Influence" indicator, which also reflects the overall/total impact of an article in the research community at large, based on the underlying citation network (diachronically).
    1
    popularity
    This indicator reflects the "current" impact/attention (the "hype") of an article in the research community at large, based on the underlying citation network.
    Average
    influence
    This indicator reflects the overall/total impact of an article in the research community at large, based on the underlying citation network (diachronically).
    Average
    impulse
    This indicator reflects the initial momentum of an article directly after its publication, based on the underlying citation network.
    Average
Powered by OpenAIRE graph
Found an issue? Give us feedback
selected citations
These citations are derived from selected sources.
This is an alternative to the "Influence" indicator, which also reflects the overall/total impact of an article in the research community at large, based on the underlying citation network (diachronically).
BIP!Citations provided by BIP!
popularity
This indicator reflects the "current" impact/attention (the "hype") of an article in the research community at large, based on the underlying citation network.
BIP!Popularity provided by BIP!
influence
This indicator reflects the overall/total impact of an article in the research community at large, based on the underlying citation network (diachronically).
BIP!Influence provided by BIP!
impulse
This indicator reflects the initial momentum of an article directly after its publication, based on the underlying citation network.
BIP!Impulse provided by BIP!
1
Average
Average
Average
Upload OA version
Are you the author of this publication? Upload your Open Access version to Zenodo!
It’s fast and easy, just two clicks!