Risk Evaluation on UHV Power Transmission Construction Project Based on AHP and FCE Method

Article English OPEN
Zhao, Huiru ; Guo, Sen (2014)
  • Publisher: Hindawi Publishing Corporation
  • Journal: Mathematical Problems in Engineering (issn: 1024-123X, eissn: 1563-5147)
  • Related identifiers: doi: 10.1155/2014/687568
  • Subject: TA1-2040 | Mathematics | Engineering (General). Civil engineering (General) | QA1-939 | Article Subject

Ultra high voltage (UHV) power transmission construction project is a high-tech power grid construction project which faces many risks and uncertainty. Identifying the risk of UHV power transmission construction project can help mitigate the risk loss and promote the smooth construction. The risk evaluation on “Zhejiang-Fuzhou” UHV power transmission construction project was performed based on analytic hierarchy process (AHP) and fuzzy comprehensive evaluation (FCE) method in this paper. After the risk evaluation index system was built, the AHP was used to determine the weights of risk indicators, and the FCE method was to perform the risk evaluation. The evaluation result shows that (1) “Zhejiang-Fuzhou” UHV power transmission construction project has moderate risk, which indicates the occurrence probability of project risk is medium and the risk occurrence will cause general loss for project, (2) “society risk” has the highest level, and the next is “policy and law risk,” “technique risk,” “natural environmental risk,” and “Management risk,” respectively, and it should keep main eye on the social risk, policy and law risk, and technique risk. Finally, according to the risk evaluation result, the specific risk control recommendations were proposed for the smooth construction of this project.
  • References (16)
    16 references, page 1 of 2

    Liu, J. P., Niu, D. X., Song, X. H.. The energy supply and demand pattern of China: a review of evolution and sustainable development. Renewable and Sustainable Energy Reviews. 2013; 25: 220-228

    Lin, C. C., Yang, C. H., Shyua, J. Z.. A comparison of innovation policy in the smart grid industry across the pacific: china and the USA. Energy Policy. 2013; 57: 119-132

    Bolinger, M., Wiser, R.. A comparative analysis of business structures suitable for farmer-owned wind power projects in the United States. Energy Policy. 2006; 34 (14): 1750-1761

    Grassi, S., Chokani, N., Abhari, R. S.. Large scale technical and economical assessment of wind energy potential with a GIS tool: case study Iowa. Energy Policy. 2012; 45: 73-85

    Hellström, M., Ruuska, I., Wikström, K., Jåfs, D.. Project governance and path creation in the early stages of Finnish nuclear power projects. International Journal of Project Management. 2013; 31 (5): 712-723

    Baumann, P., Stevanella, G.. Fish passage principles to be considered for medium and large dams: the case study of a fish passage concept for a hydroelectric power project on the Mekong mainstem in Laos. Ecological Engineering. 2012; 48: 79-85

    Amatayakul, W., Berndes, G.. Determining factor for the development of CDM biomass power projects. Energy for Sustainable Development. 2012; 16: 197-203

    Liu, J. L., Li, Q. X., Wang, Y. H.. Risk analysis in ultra deep scientific drilling project-A fuzzy synthetic evaluation approach. International Journal of Project Management. 2013; 31 (3): 449-458

    Badri, A., Nadeau, S., Gbodossou, A.. A new practical approach to risk management for underground mining project in Quebec. Journal of Loss Prevention in the Process Industries. 2013; 26 (6): 1145-1158

    Song, J. B., Song, D. R., Zhang, X. Q., Sun, Y.. Risk identification for PPP waste-to-energy incineration projects in China. Energy Policy. 2013; 61: 953-962

  • Metrics
    No metrics available
Share - Bookmark