Measuring the effectiveness of condition assessment

Article English OPEN
Dlamini, D.; Wu, Shaomin; Pollard, Simon J. T.;
(2011)
  • Subject: HA33

Assessing maintenance effectiveness is critical for asset managers in order to evaluate the contribution of maintenance towards business goals and to plan preventive maintenance activities. In this paper, Delly Dlamini, Shaomin Wu and Simon Pollard propose a method for ... View more
  • References (35)
    35 references, page 1 of 4

    Ansell, J,Archibald,T, Dagpunar, J,Thomas, LC, Abell, P, and Duncalf, D (2003) Analysing maintenance data to gain insight into systems performance. Journal of the Operational Research Society, 54 (4), 343-349.

    AWWA (2006) Asset management planning and reporting options for water utilities.American WaterWorks Association Research Foundation, USA.

    Bedford,T, Quigley, J andWalls, L (2006) Expert elicitation for reliable system design. Statistical Science, 21 (4), 428-450.

    Bertling, L,Allan, R and Eriksson, R (2005) A reliability-centered asset maintenance method for assessing the impact of maintenance in power distribution systems. IEEETransactions on Power Systems,Vol. 20 (1), 75-82.

    Boring, RL (2007) A review of expertise and judgment processes for risk estimation. In Risk, Reliability and Societal Safety,Volume 2: ThematicTopics. Proceedings of the European Safety and Reliability Conference (ESREL 2007), edited byT Aven and JEVinnem (pp. 1901-1907).Taylor & Francis, London, UK.

    British Standards 3811 (1993) Glossary of terms used in terotechnology. British standards, UK.

    Chu, C and Durango-Cohen, PL (2008) Incorporating maintenance effectiveness in the estimation of dynamic infrastructure performance models. Computer-Aided Civil and Infrastructure Engineering 23, 174-188.

    Clemen, RT andWinkler, RL (1999) Combining probability distributions from experts in risk analysis. Risk Analysis, 19 (2), 187-203.

    Crocker J (2010) Effectiveness of maintenance. Journal of Quality in Maintenance Engineering, 5 (4), 307-313.

    Davis, P, De Silva, D, Marlow, D, Moglia, M, Gould S and Burn, S (2008) Failure prediction and optimal scheduling of replacements in asbestos cement water pipes. Journal ofWater Supply: Research andTechnology - AQUA, 57 (4), 239-252.

  • Similar Research Results (1)
  • Metrics
Share - Bookmark