publication . Article . 2014

Virtual reality-based cloud BIM platform for integrated AEC projects

Jack Steven Goulding; Farzad Rahimian; Xiangyu Wang;
Open Access English
  • Published: 01 Sep 2014
Abstract
Building Information Modelling (BIM) has demonstrated the need for integrating collaborative design teams’ “project data”, to not only help coordinate the design, engineering, fabrication, construction, and maintenance of various trades, but also facilitate project integration and interchange. Numerous potential benefits have inspired several countries to consider the implications of implementing BIM Level 3 (Cloud) as an innovative way of further enhancing the design, management and delivery process, ergo - a paradigm shift towards Integrated Project Delivery (IPD). Amongst the myriad of the available innovative approaches, web-based platforms are particularly ...
Subjects
free text keywords: TH, QA75, Z665
56 references, page 1 of 4

Alshawi, M., Goulding, J. S., & Nadim, W. (2007). Training and Education for Open Building Manufacturing: Closing the Skills Gap. In A. S. Kazi, M. Hannus, S. Boudjabeur & A. Malon (Eds.), Open Building Manufacturing: Core Concepts and Industrial Requirements. Helsinki, Finland: ManuBuild in collaboration with VTT - Technical Research Centre of Finland. [OpenAIRE]

Aranda-Mena, G., & Wakefield, R. (2006). Interoperability of building information - Myth or reality? Paper presented at the The 6th European Conference on Product and Process Modeling, Valencia, Spain

Arif, M., Kulonda, D., Jones, J., & Proctor, M. (2005). Enterprise information systems: technology first or process first? Business Process Management Journal, 11(1), 5 - 21. doi: 10.1108/14637150510578692

Australian Institute of Architects. (2009). National Building Information Modelling (BIM) Guidelines and Case Studies. Australia: Construction Innovation.

Autodesk®. (2011). Realizing the Benefits of BIM, Autodesk® Building Information Modeling. from http://images.autodesk.com/adsk/files/2011_realizing_bim_final.pdf

BIM Task Group. (2013). UK BIM Task Group Website. from http://www.bimtaskgroup.org

Blosiu, J. O. (1999). Use of synectics as an idea seeding technique to enhance design creativity. Paper presented at the Systems, Man, and Cybernetics, 1999. IEEE SMC '99 Conference Proceedings. 1999 IEEE International Conference on, 1999.

Cera, C. D., Reagali, W. C., Braude, I., Shapirstein, Y., & C.Foster. (2002). a Collaborative 3D Environment for Authoring Design Semantics. Graphics in Advanced Computer-Aided Design, 22(3), 43-55. [OpenAIRE]

Clayton, M., Kunz, J., & Fischer, M. (1998). The Charrette Test Method (pp. 28). Stanford, CA: CENTER FOR INTEGRATED FACILITY ENGNEERING, STANFORD UNIVERSITY.

Colombo, A. W., & Harrison, R. (2008). Modular and collaborative automation: achieving manufacturing flexibility and reconfigurability. International Journal of Manufacturing Technology and Management, 14(3/4), 249-265.

De Freitas, S., & Oliver, M. (2006). How can exploratory learning with games and simulations within the curriculum be most effectively evaluated? Computers & Education, 46(3), 249-264.

Eastman, C., Fisher, D., Lafue, G., Lividini, J., Stoker, D., & Yessios, C. (1974). An Outline of the Building Description System Research Report No. 50: Institute of Physical Planning.

Egan, J. (1998). The Egan Report - Rethinking Construction, Report of the Construction Industry Taskforce to the Deputy Prime Minister. London: HSMO.

EON Reality Inc. (2008). Introduction to Working in EON Studio: http://www.eonreality.com.

Fischer, M. (2000). 4D CAD-3D models incorporated with time schedule, CIFE Centre for Integrated Facility Engineering in Finland, VTT-TEKES, CIFE Technical Report, : Stanford University.

56 references, page 1 of 4
Powered by OpenAIRE Open Research Graph
Any information missing or wrong?Report an Issue
publication . Article . 2014

Virtual reality-based cloud BIM platform for integrated AEC projects

Jack Steven Goulding; Farzad Rahimian; Xiangyu Wang;