project . 2015 - 2019 . Closed

ELYntegration

Grid Integrated Multi Megawatt High Pressure Alkaline Electrolysers for Energy Applications
Open Access mandate for Publications European Commission
  • Funder: European CommissionProject code: 671458 Call for proposal: H2020-JTI-FCH-2014-1
  • Funded under: H2020 | FCH2-RIA Overall Budget: 3,301,390 EURFunder Contribution: 1,861,310 EUR
  • Status: Closed
  • Start Date
    01 Sep 2015
    End Date
    31 May 2019
  • Detailed project information (CORDIS)
  • Open Access mandate
    Research Data: No
Description
The strategic goal of the ELYntegration Project is the design and engineering of a robust, flexible, efficient and cost-competitive single stack Multimegawatt High Pressure Alkaline Water Electrolysis of 4,5 T H2/day capable to provide cutting-edge operational capabilities under highly dynamic power supplies expected in the frame of generation/ transmission/ distribution scenarios integrating high renewable energies (RE) shares. The final design of the MW HP AWE will be achieved on the basis of the development, validation and demonstration of a HP AWE industrial prototype of 250 kW (250 HP AWE) (TRL 7) comprising: - cylindrical stack consisting of industrial siz...
Description
The strategic goal of the ELYntegration Project is the design and engineering of a robust, flexible, efficient and cost-competitive single stack Multimegawatt High Pressure Alkaline Water Electrolysis of 4,5 T H2/day capable to provide cutting-edge operational capabilities under highly dynamic power supplies expected in the frame of generation/ transmission/ distribution scenarios integrating high renewable energies (RE) shares. The final design of the MW HP AWE will be achieved on the basis of the development, validation and demonstration of a HP AWE industrial prototype of 250 kW (250 HP AWE) (TRL 7) comprising: - cylindrical stack consisting of industrial siz...
Any information missing or wrong?Report an Issue