Powered by OpenAIRE graph
Found an issue? Give us feedback

COMPANIA NATIONALA DE TRANSPORT AL ENERGIEI ELECTRICE TRANSELECTRICA SA

Country: Romania

COMPANIA NATIONALA DE TRANSPORT AL ENERGIEI ELECTRICE TRANSELECTRICA SA

14 Projects, page 1 of 3
  • Funder: European Commission Project Code: 727481
    Overall Budget: 4,996,650 EURFunder Contribution: 4,996,650 EUR

    Future energy systems will use renewable energy sources to minimise CO2 emissions. Currently large generators powered by fossil fuel turbines maintain the stability and quality of energy supplies through their inertia. The inertia of these generator-turbine groups gives providers a significant time window in which to react to network events. We urgently need to find ways to stabilise energy systems with up to 100% RES (where inertia is often lost due to power converter mediated energy transfer) to generate “RE-SERVEs” so that society can relax in the knowledge that it has a stable and sustainable energy supply. RE-SERVE will address this challenge by researching new energy system concepts, implemented as new system support services enabling distributed, multi-level control of the energy system using pan-European unified network connection codes. Near real-time control of the distributed energy network will be enabled by innovative 5G based ICT. Energy system use case scenarios supplied by energy providers will form the basis of energy system models. Performance characteristics of the new control mechanisms will be investigated through integration of energy simulations and live 5G communications. We will create a pan-European multi-site simulation test-bed, bringing together the best facilities in Europe. RE-SERVE results include published models of system support services, innovative architectures for the implementation of the services, performance tests on our pan-European real-time simulation, and live, test-beds, a model for pan-European unified network connection codes and actions to promote results to standardisation organisations, all of which maintain the RE-SERVE in energy systems. Commercialisation of results will result in breakthroughs in the efficient utilisation of use of RES, a spin-off and a wide range of enhanced professional solutions and services.

    visibility2K
    visibilityviews2,354
    downloaddownloads4,685
    Powered by Usage counts
    more_vert
  • Funder: European Commission Project Code: 261696
    visibility6
    visibilityviews6
    downloaddownloads8
    Powered by Usage counts
    more_vert
  • Funder: European Commission Project Code: 218217
    more_vert
  • Funder: European Commission Project Code: 285647
    visibility29
    visibilityviews29
    downloaddownloads112
    Powered by Usage counts
    more_vert
  • Funder: European Commission Project Code: 691777
    Overall Budget: 12,985,200 EURFunder Contribution: 12,985,200 EUR

    Four European TSOs of Central-Eastern Europe (Austria, Hungary, Romania, Slovenia), associated with power system experts, electricity retailers, IT providers and renewable electricity providers, propose to design a unique regional cooperation scheme: it aims at opening Balancing and Redispatching markets to new sources of flexibility and supporting such sources to act on such markets competitively. Thanks to a prototype aggregation solution and renewable generation forecasting techniques, flexibility providers – distributed generators (DG) and Commercial and Industrial (C&I) consumers providing demand response (DR) – are enabled, through retailers acting as flexibility aggregators, to provide competitive offers for Frequency Restoration Reserve (including secondary control activated with a response time between 30 seconds and 15 minutes). A comprehensive techno-economic model for the cross-border integration of such services involves a common activation function (CAF) tailored to congested borders and optimized to overcome critical intra-regional barriers. The resulting CAF is implemented into a prototype Regional Balancing and Redispatching Platform, securely integrated within the four TSOs’ IT systems: this makes research activities about cross-border integration flexible while linking with the aggregation solution. Use cases of growing complexity are pilot tested, going from the involvement of DR and DG into national balancing markets to cross-border competition between flexibility aggregators. Based on past experience with tertiary reserve, participating C&I consumers and DG are expected to provide close to 40MW of secondary reserve. Impact analyses of the pilot tests together with dissemination activities towards all the stakeholders of the electricity value chain will recommend business models and deployment roadmaps for the most promising use cases, which, in turn, contribute to the practical implementation of the European Balancing Target Model by 2020.

    more_vert

Do the share buttons not appear? Please make sure, any blocking addon is disabled, and then reload the page.

Content report
No reports available
Funder report
No option selected
arrow_drop_down

Do you wish to download a CSV file? Note that this process may take a while.

There was an error in csv downloading. Please try again later.